亚洲欧美视频一区二区_欧美成综合网网站_欧美日韩午夜视频在线观看_欧美在线视频一区_久久精品视频3_久久久久久久精品电影

Press & report

Is Your Photovoltaic Power Station Ready For Summer?

The turn of spring and summer is a period of frequent strong convective weather, and the subsequent hot summer is accompanied by high temperature, heavy rain and thunder and other weather, and the photovoltaic power station on the roof has undergone multiple tests. So, how do we usually take countermeasures to ensure the stable operation of photovoltaic power plants and ensure profits?


For summer heat

1. Pay attention to cleaning and cleaning the shelters on the power station, so that the components are always in a state of ventilation and heat dissipation.

2. Please clean the power station in the early morning or evening, avoid exposure to the sun and high temperature at noon and afternoon, because the sudden cooling will cause the temperature difference of the glass plate of the module, and there may be cracks on the surface of the panel. Therefore, it is necessary to choose early morning and evening when the temperature is lower.

photovoltaic

3. High temperature may cause the aging of the internal components of the inverter, so it is very important to ensure that the inverter has good ventilation and heat dissipation conditions. The inverters are basically installed outdoors. During installation, SKYWORTH puts the inverters in a cool place to avoid direct sunlight, such as the back of the module and under the eaves. A cover plate will be added for outdoor installations to fully ensure the ventilation of the inverters. and heat dissipation.


Rainstorm for summer

A lot of rainwater will soak the cables and components, which will reduce the insulation performance. If it is damaged, it will directly lead to the inability to generate electricity.

If your house has a sloping roof, it will have a strong drainage capacity, please don't worry;

3

If it is a flat roof, frequent inspections of the power station are required. Note: During inspection operation and maintenance in rainy days, avoid electrical operations with bare hands, do not directly touch the inverter, components, cables, and terminals, etc., you need to wear rubber gloves and rubber boots to reduce the risk of electric shock.


Lightning for summer

The lightning protection facilities of photovoltaic power plants should also be checked regularly. In the current lightning protection measures, the most effective and extensive method is to connect the metal parts of electrical equipment to the ground. The grounding system consists of four parts: grounding equipment, grounding body, lead-in wire and earth.

4

Avoid repairing electrical equipment and circuits with bare hands, wear insulating rubber gloves, beware of the risk of electric shock, and take measures to prevent high temperature, rainstorm, typhoon, and lightning strikes. It should be noted that Skyworth Photovoltaic and PICC have purchased exclusive comprehensive insurance for each power station to escort the power station, and users do not need to bear the risk for damage caused by natural disasters.


FACEBOOK

  • Pre sales consultation
  • After sales consultation

customer service

Linkedin

  • Pre sales consultation
  • After sales consultation

customer service

CONTACT US

  • Pre sales consultation
  • After sales consultation

customer service

Whatsapp

return

Sweep the official account

av一本在线人妻无码中字 | 亚洲综合AV在线在线播放 | 国产精品186在线观看在线播放 | HEYZO亚洲精品日韩精品 | 国产精品无码一级毛片 | 亚洲视频日本有码中文 | 国产在线精品一区二区在线看 | 国产亚州精品女人久久久久久 | 欧美老熟妇欲乱高清视频 | 国产精品美女久久久久AV超清 | 夜夜高潮夜夜爽精品视频 | 日韩高青综合在线一区二区 | 久久精品人妻中文系列 | 国产精品自产拍在线观看 | 无码中文人妻在线一区 | 中文字幕一区二区人妻本田岬 | 97人妻无码免费视频一区 | 亚洲中文字幕在线观看视频 | 中文字幕AV制服丝袜电影 | 国产精品无码无卡A级毛片 亚洲成a人片在线观看国产 | 久久se精品一区二区三区 | 中文字幕日韩精品无码内射 | 欧美成人www在线观看 | 一级a做一级a做片性高清视频 | 特级精品毛片免费观看 | 亚洲日本一区二区一本一道 | 久久人人玩人妻潮喷内射人人 | 亚洲中文字幕a∨在线 | 国内精品九九久久精品 | 亚洲人成网77777亚洲色 | 国产成人精品123区免费视频 | 羞羞麻豆国产精品1区2区3区 | 久久国产V一级毛多内射 | 毛片无码免费无码播放 | 日韩亚洲欧美一区二区三区 | 人妻夜夜爽天天爽三区麻豆AV网站 | 先锋影音一区三区在线观看 | 国产欧美日韩专区发布 | 亚洲无AV在线中文字幕 | 国产精品午夜久久久久久久 | 综合人妻久久一区二区精品 |